Co-organiser
GBI Sustainable Data Centre Forum
Selamat datang ke Iskandar Puteri
Every AI answer is made in a building like this
used by the world's data centres in 2025
About 0 TWh by 2030. Double in five years, around 3% of all the electricity on Earth.
Source: IEA, Key Questions on Energy and AI, April 2026 (base case)
Johor
Nearly eight times more capacity promised than switched on. Every megawatt arrives with a grid connection and a water source.
Live IT capacity: Tokyo 1,473 MW, Singapore 1,118 MW, Johor 1,110 MW. Johor colocation vacancy 0.7%. Source: Knight Frank, Data Centre Atlas 2026
Malaysia, this year
The Muar test
GBI estimate, cited at the MITI launch of the GBI Data Centre Tool v2, 24 July 2025
Sequence matters
Written in advance, a standard is a design tool.
Written under pressure, it is damage control.
Green Building Index · since 2009 · register as of 31 October 2026
Data centres on the GBI register
Tool v2 · Energy · 38 of 100 points
Scale: PUE 1.60 earns 1 point, PUE 1.26 earns all 24. For reference, the global average is 1.52 (Uptime Institute, 2026) and the MIDA design ceiling for hyperscale is 1.4.
Tool v2 · Water · 19 of 100 points
For a 300 MW IT load, 2.40 to 1.45 L/kWh is about 0 million litres a day left in the reservoir.
12 points for WUE down to 1.45, plus 3 for a drought contingency plan. Water-free cooling designs can score in full. Daily figure is illustrative, at full IT load. For reference, the MIDA design ceiling is 2.2 L/kWh.
Efficiency first, renewables second, offsets last
Tool v2 · 100 points
Building Smarter Data Centre: From Policy to Performance
Right the first time
Enjoy the forum and the workshop.
Ar. Sarly Adre Sarkum · greenbuildingindex.org
Scan for every GBI certified projectgallery.greenbuildingindex.org