Co-organiserSynergistic GUCI Seminar 2026

GBI Sustainable Data Centre Forum

Building SmarterData CentresFrom Policy to Performance

GUCI Seminar 2026Iskandar Puteri, Johor23 November 2026
Ar. Sarly Adre SarkumChief Executive Officer, Green Building Index

Selamat datang ke Iskandar Puteri

Today's forum is GUCI in one room

G
Government
Majlis Bandaraya Iskandar Puteri, the city that approves and hosts these buildings.
U
University
Universiti Teknologi Malaysia and the next generation of engineers and architects.
C
Community
PAM Southern Chapter and the profession, and the neighbours who share the grid and the water.
I
Industry
Owners, operators, designers, and our sharing partners Rockwool, RED Engineering Tractebel and MAPEI.

Every AI answer is made in a building like this

0 TWh

used by the world's data centres in 2025

About 0 TWh by 2030. Double in five years, around 3% of all the electricity on Earth.

Source: IEA, Key Questions on Energy and AI, April 2026 (base case)

Johor

Built today, and what is already queued

0MW live
third in Asia Pacific
0MW in the pipeline
largest in Asia Pacific

Nearly eight times more capacity promised than switched on. Every megawatt arrives with a grid connection and a water source.

Live IT capacity: Tokyo 1,473 MW, Singapore 1,118 MW, Johor 1,110 MW. Johor colocation vacancy 0.7%. Source: Knight Frank, Data Centre Atlas 2026

Malaysia, this year

The numbers the grid and the taps are watching

RM0bil
data centre and cloud investment approved, January to September 2026, up 44.5%
MIDA, 17 Nov 2026
0GW
maximum demand under TNB supply agreements with 61 data centre projects
TNB, Aug 2026
7%→31%
data centres' share of Peninsular electricity demand, 2026 to 2035
PETRA, Jul 2026
0%
minimum renewable energy now required of data centres
Deputy Prime Minister, Oct 2026

The Muar test

One 300 MW data centre

2×the electricity of the whole of Muar
30%of Muar's domestic water

GBI estimate, cited at the MITI launch of the GBI Data Centre Tool v2, 24 July 2025

Design already decides this. Johor's 19 operating data centres draw 21.3 million litres a day, 1.05% of the state's treated water. 9 of the 19 use zero-water cooling. The pipeline is what changes the sum.
Johor State Assembly, 20 November 2026

Sequence matters

Write the standard before the freeze

24 Jul 2025
MITI launches the GBI Data Centre Tool v2. PUE, WUE, carbon, water and resilience, written for Malaysia.
Nov 2025
Johor stops approving Tier 1 and Tier 2 data centres, the heaviest water users. Reclaimed water required.
Feb 2026
New data centre applications not related to AI stopped, the Prime Minister tells Parliament.
Sep 2026
Thailand pauses 49 data centres under construction and 117 awaiting approval.
Oct 2026
Data centres must use at least 30% renewable energy, and pay for the capacity they reserve.
Today
Iskandar Puteri: city, university, profession and industry in one room.

Written in advance, a standard is a design tool.
Written under pressure, it is damage control.

Green Building Index · since 2009 · register as of 31 October 2026

0
projects registered since 2009
0
projects certified
0M sq ft
of certified floor area
0ktCO₂e
estimated emissions avoided every year
0 certifiedJohor, fourth of all states
150 projects registered in Johor. Iskandar Puteri is already on the register: the MBIP headquarters, the Sunway City Iskandar Puteri township, and Medini 9 and 10.

Data centres on the GBI register

Four in seven years. Five in sixteen months.

2014
NTT Cyberjaya4 Data Center
Cyberjaya
Certified
2015
NTT Cyberjaya3 Data Center
Cyberjaya
Certified
2017
TM Klang Valley Core Data Centre
Klang Valley
Certified
2021
AIMS Data Centre
Cyberjaya
Certified
2025
NEXTDC Data Center
Kuala Lumpur
Platinum
2025
Basis Bay Phase 1
Cyberjaya
Gold
2025
PDG JH1 Phase 3 DC4
Sedenak Tech Park, Kulai
Gold
2025
AIMS Data Centre Phase 2
Cyberjaya
Certified
2026
PDG JH1 Phase 4 DC2
Sedenak Tech Park, Kulai
Gold
5rated since July 2025, including the first Platinum data centre on the GBI register
2in Johor, both Gold, both in Sedenak Tech Park, Kulai
NextIskandar Puteri's first

Tool v2 · Energy · 38 of 100 points

Performance, not paperwork: PUE

Total facility power ÷ IT power
1.60PUE, the entry point
60% extra energy for cooling and losses
1 point of 24

Scale: PUE 1.60 earns 1 point, PUE 1.26 earns all 24. For reference, the global average is 1.52 (Uptime Institute, 2026) and the MIDA design ceiling for hyperscale is 1.4.

Tool v2 · Water · 19 of 100 points

Water Usage Effectiveness: WUE

Litres of water ÷ kWh of IT energy
2.40litres per kWh
the entry point
1 of 15 water performance points

For a 300 MW IT load, 2.40 to 1.45 L/kWh is about 0 million litres a day left in the reservoir.

12 points for WUE down to 1.45, plus 3 for a drought contingency plan. Water-free cooling designs can score in full. Daily figure is illustrative, at full IT load. For reference, the MIDA design ceiling is 2.2 L/kWh.

Efficiency first, renewables second, offsets last

Net zero, in the right order

1
Use less
PUE carries the biggest single block of points in the tool.
2
Make your own
On-site renewables, 3.6 to 18 kWh a year per m² of footprint, up to 5 points.
3
Then offset
Renewable energy or carbon offsets for 25%, 50% or 90% of use, up to 5 points.
Embodied carbonThird-party certified, SIRIM accepted
CircularityReuse, modularity, design for disassembly
Zero-carbon backupBiofuel, hydrogen or syngas gensets
E-wasteServers and batteries managed to the end
Pocket forestBiodiversity and a biophilic workplace
Flood and droughtStormwater filtration, drought contingency
Brownfield reuseAbandoned buildings given a second life
ConnectivityTransit, cycling, carpool, EV charging

Tool v2 · 100 points

More than half the score is energy and water

Energy Efficiency38
Water Efficiency19
Materials and Resources19
Sustainable Site9
Environmental Quality8
Innovation7
50= Certified
66= Silver
76= Gold
86= Platinum

Building Smarter Data Centre: From Policy to Performance

From policy to the drawing board

11.20
Welcome
Ar. Sarly Adre Sarkum, GBI
You are here
11.50
How the GBI Data Centre Tool v2 addresses energy, water and public concerns
Ir. Tang Chee Khoay, Head of the GBI Data Centre Tool Development Committee
2.00
Sharing session
Ms Nguang Suok Ling, Rockwool Malaysia
2.30
Insights
Mr. Huang Yimin, RED Engineering Tractebel (Singapore)
3.20
Questions and answers
All speakers
Tomorrow24 Nov, 9.00 am
GBI Sustainable Data Centre Design Workshop. A technical session with Ir. Tang Chee Khoay and Ar. Dr. Serina Hijjas, then teams design a data centre against the tool. Sharing session by MAPEI. 4 CPD points each day.

Right the first time

Build the measure,
not the moratorium

Owners and operators
Register your next data centre with GBI
Set PUE and WUE targets at concept stage, when they cost least.
City and state
Let the tool carry policy
A published, measurable benchmark for approvals, already written for Malaysia.
University and profession
Teach it, test it, improve it
Every GBI tool is reviewed. Bring us your data and your findings.

Terima kasih.

Enjoy the forum and the workshop.

Ar. Sarly Adre Sarkum · greenbuildingindex.org

QR code to the GBI project galleryScan for every GBI certified projectgallery.greenbuildingindex.org
Green Building Index
--:-- · 00:00